Project Description
In RAS al-Khair/Saudi Araba, located about 75 km northwest of the city of Al Jubayl, a combined-cycle gas turbine power plant is being erected. The plant will include 6 blocks with each 2 gas turbines and 1 steam turbine. With a total capacity of 2,400 MW, the plant will energise an aluminium smelter as well as a seawater desalination plant which shall generate around 1 billion drinking water per day for 5 million inhabitants of Riyadh, the capital of Saudi Arabia.
| Project type: | Combined-cycle gas turbine power plant |
| Location: | Asia (Saudi-Arabia – Ras Al-Khair) |
| Investment amount: | 2.4 billion $ |
| Investor: | SWCC Saline Water Conversion Corp. |
| Time period: | 01.07.2011 – 31.12.2013 |
| Performance: | Project Management / Scheduling / Project Planning |
Project management, claim management and overall planning and control of the engineering for a combined cycle power plant.