Project Description
70 km south of Jeddah (Kingdom of Saudi Arabia) a 2,650 megawatt power plant is erected which is going to be one of the biggest thermal power plants in the Middle East. Upon completion, it will produce enough electricity for about two million people or 5 % of Saudi Arabia’s entire power generation capacity.
| Project type: | Combined-cycle gas turbine power plant |
| Location: | Saudi Arabia (Jeddah) |
| Investment amount: | 2.4 billion EUR |
| Investor: | SEC (Saudi Electricity Co.) |
| Time period: | 01.01.2013 – 31.07.2013 |
| Performance: | Planning engineer, schedule export |
Analysis of the overall schedule and the expediting repots of the EPC turnkey contractor Hyundai Heavy Industries as owner’s engineer. 2,650 MW electrical power, oil fired thermal power plant ( 4 sets of oil fired boilers, 4 STG sets) in the Kingdom of Saudi Arabia.