Project Description
At the Bitterfeld chemical park, PV Crystalox Solar GmbH builts one of the first European plants which solely produces pure solar silicon. An output of 900 MT in 2009 and a subsequent increase to 1800 MT ist planned.
At the Bitterfeld chemical park, PV Crystalox Solar GmbH builts one of the first European plants which solely produces pure solar silicon. An output of 900 MT in 2009 and a subsequent increase to 1800 MT ist planned.
Project type: | Solar plant |
Location: | Germany (Bitterfeld) |
Investment amount: | 100 million EUR |
Investor: | PV Crystalox Solar GmbH |
Time period: | 01.09.2007 – 30.04.2009 |
Performance: | Time schedule |
Scheduling and control for planning, building and commissioning of the complete installation.