A clearly structured project organisation with consistent communication lines is an essential component for the success of every project. A “breathing” project organisation, however, allows to take over the overall responsibility on one end and to combine and to put together powerful and productive project teams.
We generate professional organisation charts and functional job descriptions. We provide cost estimates, coordinate interfaces and produce time schedules. These schedules are the basis for resource planning and/or are determined by the available resources.
We control the timely preparation of design and permit documents and in case secure the timelines and milestones by early implementation of the technical planner and/or surveyer. The schedule parameters and timeframe thereby is a result of the entire project duration, respecting the procurement activities, lead times and specific requirements of the project site. Precise project targets in terms of the quality of interfaces and their timely availability reduces the amount of claims and greatly contributes to a high degree of cost certainty.
The early planning of startup and commissioning procedure, the timely preparation, coordination and controlled administration of the required documents ensures the handover of the project in due time. The execution and correction of faults, shortcomings and deficiencies during construction, together with a timely preparation, review and handover of the final documentation secures an early project close out and mitigates the risk of cost and budget overrun and avoidance of “post-completion” project cost. We thereby apply to the “critical path” methodology.
We have given proof of the efficiency of our integrated “method of work” in numerous “fast track” projects.