Project Description
A semiconductor plant wich was established in 1991 will be extended for the production of 200 mm wafers. The new Anstrem-T production site shall have a clean room aera of 6,000 m². An additional building for gas, chemical and ultrapure water supply will be erected as well as a natural gas-powered energy supply center for electricity, heating and cooling.
| Project type: | Semiconductor plant |
| Location: | Russian Federation (Moskau/Zelenograd) |
| Investment amount: | 150 million EUR |
| Investor: | Anstrem-T JSC |
| Time period: | 01.04.2008 – 31.07.2010 |
| Performance: | Time scheduling |
Preparing of contract schedules as well as overall planning and project control for design, procurement, construction and start up an enhancement of an existing fab, including cogeneration plant.